Swiss federal authorities

Advisory opinions

3 documents
3 documents found. You are viewing page 1 from 1 pages.
  • Cover of the document Stellungnahme des ENSI zur Kostenstudie

    ENSI’s advisory opinion concerning the 2021 cost study

  • Cover of the document Stellungnahme des ENSI zur Kostenstudie
    News, Posts

    The 2021 cost study reflects the state of the art and makes pragmatic assumptions

    The basic technical information contained in the 2021 cost study is suitable to calculate expected costs for the decommissioning of nuclear installations in Switzerland and for disposing of radioactive waste. This was the conclusion reached by the Swiss Federal Nuclear Safety Inspectorate (ENSI) based on its technical review of the cost studies carried out the…

  • Documents

    ENSI Review of the Axpo Power AG Safety Case for the Reactor Pressure Vessel of the Beznau NPP Unit 1

    In the summer of 2012, findings are detected in the basic material of the reactor pressure vessel of the Belgian nuclear power plant Doel-3. As a result, nuclear power plants in Switzerland also have to carry out inspections. Since findings are also detected in the reactor pressure vessel of Beznau 1, Axpo needs to prove…