Swiss federal authorities

Other documents

40 documents
40 documents found. You are viewing page 2 from 5 pages.
  • ENSI Final Report: Review Approach and Comments Concerning the PEGASOS Refinement Project (PRP) and the PRP Summary Report

    ENSI-AN-9060 The Swiss Federal Nuclear Safety Inspectorate ENSI has set out new requirements for assessing seismic hazards in Swiss nuclear power plants in the light of the latest scientific findings. Plant operators are required to provide further proof, in three stages, by the end of 2020, that their plants can withstand even an extremely unlikely…

  • Rules of procedure of the International Review Panel on Beznau Reactor Pressure Vessel

    These rules of procedure govern the activities of the International Review Panel (IRP) on the Beznau Nuclear Power Plant unit 1 reactor pressure vessel integrity re-assessment. The re-assessment of the Beznau NPP unit 1 reactor pressure vessel’s integrity has been required from the operator based on reported findings following ultrasonic tests. The role of the…

  • Guideline for the Manufacture and Use of Packaging

    The „Quality Management Guideline for the Manufacture and Use of Packaging for the Transport of Radioactive Material“ provides recommendations for designers, manufacturers, owners and users of packages for radioactive material either subject to mandatory approval or subject to mandatory testing. The guideline states more precisely the quality assurance requirements referenced in sub-section 1.7.3 of the…

  • Letter from ENSI to WENRA „Reactor Pressure Vessel in Swiss NPP Beznau 1: Detection of flaw indications similar to those identified in Belgium”

    After flaw indications in the reactor pressure vessel of Beznau 1 had been detected, ENSI informed the members of the Western European Nuclear Regulators’ Association WENRA.

  • Fifth Review Meeting Joint Convention: Country Group 3 Rapporteur’s Written Report (excerpt)

  • Agreement on the Consideration of Recommendations by the NSC in ENSI’s Expert Reports

  • EU Stress Test: Swiss National Action Plan – Follow up of the Peer Review

  • Report of the Operational Safety Review Team OSART Mission to the Mühleberg Nuclear Power Plant and Follow Up Visit

  • Implementation of post-Fukushima international recommendations

    Implementation status in Switzerland of International Recommendations: