162 documents found. You are viewing page 10 from 18 pages.
  • Letter from ENSI to WENRA „Reactor Pressure Vessel in Swiss NPP Beznau 1: Detection of flaw indications similar to those identified in Belgium”

    After flaw indications in the reactor pressure vessel of Beznau 1 had been detected, ENSI informed the members of the Western European Nuclear Regulators’ Association WENRA.

  • 2014 ENSI Oversight Report – ENSI-AN-9252

    In 2014, the licensees complied with their statutory obligations to provide ENSI with reports and nuclear safety at all plants was rated as good. There were 38 reportable events in the Swiss nuclear power plants: During the year under review, there was one reactor scram, which occurred on 5 July 2014 at the Leibstadt nuclear power plant. On the international Event Scale…

  • Documents

    Radiological Protection report 2014 – ENSI-AN-9258

    In its 11th Annual Report on Radiological Protection, ENSI summarises and analyses the release of radioactive materials from Swiss nuclear facilities. All nuclear facilities complied with the limits in 2014 and in some cases by a very large margin.

  • Fifth Review Meeting Joint Convention: Country Group 3 Rapporteur’s Written Report (excerpt)

  • Agreement on the Consideration of Recommendations by the NSC in ENSI’s Expert Reports

  • Documents

    ENSI’s Regulatory Framework Strategy

  • ENSI’s requests for the continued operation of the Mühleberg NPP (KKM) until Permanent Cessation of Operations (PCO), planned for the year 2019

    Periodic: By the end of April 2015: By the end of the 2015 annual outage: By the end of 2015: By the end of the 2016 annual outage: By the end of 2016: By the end of September 2020:  

  • EU Stress Test: Swiss National Action Plan – Follow up of the Peer Review

  • Documents

    Report of the Operational Safety Review Team OSART Mission to the Mühleberg Nuclear Power Plant and Follow Up Visit